Thursday, October 20, 2005


East wall of Gym - braced 10/20/05 Posted by Picasa


Insulation at pier 10-20-05 Posted by Picasa


Gym / Dance Studio looking NNE 10-20-05 Posted by Picasa


Curved wall at front of building 10-20-05 Posted by Picasa


Structural columns in main entry 10-20-05 Posted by Picasa


Pool 10-20-05 Posted by Picasa


Rebar started in deep end of pool 10-20-05 Posted by Picasa


Looking SE 10-20-05 Posted by Picasa


General Progress 10-20-05 Posted by Picasa

Consider Making a Last Lap Donation!


Laying a lot of block! 10-19-05 Posted by Picasa


North wall of gym 10-19-05 Posted by Picasa


North wall of Gym 10-19-05 Posted by Picasa


Laying block on a curve 10-19-05 Posted by Picasa


East wall of Wellness Center 10-19-05 Posted by Picasa


Pool and gym 10-19-05 Posted by Picasa


Setting main drains in pool 10-19-05 Posted by Picasa


Looking South 10-19-05 Posted by Picasa


Locker room area 10-19-05 Posted by Picasa


Dance studio taking shape 10-19-05 Posted by Picasa


Footers in pool equipment room 10-17-05 Posted by Picasa


Looking South 10-17-05 Posted by Picasa


Pool and East wall of gym 10-17-05 Posted by Picasa


Pool progress 10-17-05 Posted by Picasa


Mike praying he has it right! Posted by Picasa


Rebar in pool 10-17-05 Posted by Picasa