Saturday, December 24, 2005


Northeast corner of Multipurpose Room - 12/23/05


Silt bag at drainage structure - 12/23/05


Keyway for deck drain - splits at diving platform - 12/23/05


Timing system connection box and starting platform anchor blockout - 12/23/05


Epoxy coated rebar for diving platform - 12/23/05


North pool deck almost ready to pour - 12/23/05



Dance Studio storage areas going up - 12/23/05


SW storm drain crossing under water lines - 12/23/05


Installing SW storm drain - 12/23/05


Natatorium North wall - block up to bearing - 12/23/05


Gym dried in - 12/23/05


Dance Studio dried in - 12/23/05


Locker room area dried in - 12/23/05


Main hallway dried in - 12/23/05


Main hallway dried in - 12/23/05

Monday, December 19, 2005


Main entrance from locker room roof - 12/16/05


Pool area from locker room roof - 12/16/05


Locker area trusses and decking - 12/16/05


On locker room roof - looking East - 12/16/05


Complex rooflines taking shape - 12/16/05


Pool basement and East wall under wraps - 12/16/05


Installing Synko-flex water stop in pool deck/wall interface - 12/16/05


Forming pool deck over basement - 12/16/05


Tenting in East wall of pool to lay block - 12/16/05

Wednesday, December 14, 2005


View from Caritas looking West - 12/12/05


Wellness Center from Main Hall - 12/12/05


Protecting water main from freezing - 12/12/05


Gym roof 90% complete - 12/12/05


Pool shell comlete and backfilled - 12/12/05


Catch basin #5 - 12/6/05


Underground drainage - 12/6/05


Backfill around pool - 12/6/05


Tented in wall - 12/12/05


Setting up to build a wall under tent - 12/7/05


Steel over Main Entrance - 12/7/05


Welding connections of Wellness Center trusses - 12/12/05


Steel goes up on Wellness Center - 12/1/05

Thursday, December 01, 2005


Electrical conduits under gym floor - 12/1/05


Equalizing fitting in pool wall - 12/1/05


Pool wing walls poured - 12/1/05


Applying the finishing touchs to pool concrete - 12/1/05


Starting to look like a swimming pool now! - Thanks Mike and crew - 12/1/05


Walls under Whirlpool - 12/1/05


Multipurpose room walls starting up - 12/1/05


Locker room walls almost complete - 12/1/05


What's next Bob? 12/1/05


Curves everywhere! Hope Al's arc formula was right. 12/1/05


Wellness Center North wall - 12/1/05


Hope this wasn't supposed to be straight! - 12/1/05


Unloading more steel - 12/1/05